Interstate 15 and Route 210 Interchange Photos and Progress Report

This page will cover the new interchange as it progresses from dirt ramps to a full interchange.

Contract Number : 08-204304

Now Open!

New signs at the incomplete interchange - taken May 2000:

new-sign_30w_at_15.jpg (27765 bytes)
This sign was installed even though no pavement existed yet on the ramps. The ramp to I-15 south wasn't even complete yet. As of 9/00, the 30 shield has been covered over.


30e_cherry_qtr.jpg (110968 bytes)
Sign overlay as well as the sign itself were damaged in a wind storm. High winds are fairly common here especially in winter months. Freeway construction has progressed to Sierra Avenue as of September 2000.

April 1999:
Roadbed nearing completion near the future I-15/I-210 interchange.
This section of Highland Avenue no longer exists. It was removed in August 2000.

I-15/I-210 Interchange Photos (taken 4/99):

Flyover ramp piers for the SB 15 - EB 210 ramp.

15/210 Separation


October 1999 Photos :

15/210 Separation in October 1999.

210 West to 15 South connector freshly graded but unpaved. Bridge is the mainline 210 crossing over.

15 North to Route 210 connectors graded.


September 2000 Photos:

completed_ramp_15-210.jpg (106298 bytes)
Flyover ramp from I-15S to Route 210 East nearly completed. Falsework removal is in progress. Guard railing is next to be installed.

south-end_flyover.jpg (104986 bytes)
Another view of the nearly complete flyover from the connector to I-15N from Route 210 East.

210-sign_at_15.jpg (93677 bytes)
New signs at the under construction Cherry Avenue interchange. This is the first sign along the new freeway to show I-210. Every other sign still shows SR-30.

mainline_15-west.jpg (74828 bytes)
Eastbound lanes of the freeway about 0.1 miles east of the I-15 connections. Westbound lanes are still being built.

mainline-archibald_east.jpg (78241 bytes)
Eastbound lanes of the freeway about 0.1 miles east of Day Creek Road. Onramp from Day Creek Road is visible on the right.

October 2000:

15s_30e_connector_from_30_mainline.jpg (99248 bytes)
Mainline 30 westbound lanes in foreground, 30w to 15s connector in middle, 15s to 30e connector in background.

30_mainline_15_overcrossing.jpg (125165 bytes)
Mainline 30 over 15.

30w-15s_connector_from_30_mainline.jpg (88265 bytes)
View of the westbound connector to southbound 15 from the 30 mainline.

30w_15_connector_signs.jpg (99701 bytes)
Signage at the 30w to 15 connector.

January 2001:

nb_15_30_signs.jpg (109393 bytes)
New signs over northbound Route 15. Note the use of 30 shields. This will change in the near future to 210.

sb_15_onramps_from_30.jpg (87895 bytes)
View of ramps from Route 210/30 to Southbound Route 15.